The project, which 球探比分网足球即时比分旧版 undertook the survey, design, equipment supply and construction, is implemented in three phases.180km water transmission pipelines and three municipal water treatment plants were designed and constructed. The first phase includes the overall design, supply of 60km steel pipes and site construction; The second phase includes supply of 37km steel pipes and site construction, supply of 20km PEAD pipes and site installation, construction of three water treatment plants with a treatment capacity of 16 l/s, 100 l/s and 100 l/s respectively; The third phase includes supply of 59km steel pipes and site construction.
Laying of Water Transmission Pipeline

The steel pipes fabricated in 球探比分网足球即时比分旧版 arrve at the Venezuelan port